Site/ Field Experience Related Question
What are acceptance criteria of structural steel work?
Introduction
There are few items involved in the design, fabrication and erection of structural steel structure. Design engineer, steel fabricator and contractor are work together to ensure the quality and successful construction.
There are the few items discussed here.
1) Submission
of Shop drawing
In order to avoid disagreement and
argument upon of fabricated steel members (Assemblies) delivered to site not in
accordance to design drws, engineer shall instruct the fabricator to submit
shop drawing for review and comment.
2) Welding
procedure specification/ Method of statement on welding
a) Flux-cored
arc welding (FCAW) = semi-automatic or automatic arc welding process. No stick
electrode.
b) Stick
Welding = Shielded metal arc welding (SMAW) = Manual arc welding (MMA/ MMAW)
Almost all steel assemble works
inevitably involve welding works. The quality of welding affect the reliability
and strength of structural steel. Hence, this part shall be submitted prior to
commencement of mass fabrication work.
Engineer’s inspection at
fabrication yard to witness and inspect the trial welding work by qualified
welder is also deemed necessary. Both the engineer and fabricator to discuss
for the appropriate approaches.
3) Inspection
record form/ b4 delivered out from fabrication yard
All steel assemblies, prior to
delivery out from fabrication yard, should have passed internal quality control
system and in accordance to shop drawing and approved method statement. There
shall be inspection record or similar form to check and tick all necessary work
completed to required quality at yard.
4) Type
and number of test (Visual Inspection, UT test, MPI test)
a) Visual
inspection – to check uniformity of welds, surface condition like painting.
b) UT
test – to check internal flaw of the steel and weld.
c) MPI
test – to check surface and shallow depth of steel for flaw.
5) Inspection
and acceptance upon delivery to site
a) personnel
to inspect and sign the acceptance form.
b) Visual
inspection
6) Rectification
work procedure at site, such field welding.